Preparation of the terrain situation for the location where the new airport will be built in the city of Vlora, Albania.

  • Stabilization of geodetic points
  • Before starting the works, one of the first tasks is the planning of the geodetic network. The network planning was done after the final project was submitted where the locations of each facility and infrastructure were determined.
  • After the approval for the planning of the geodetic network was obtained, from which the number of geodetic points were determined, the phase of stabilization in the field has started. The points are constructed of solid material (concrete) with metal rod in its center.